Fluid Placement Simulator

| Interactive online cement job planner

Enter wellbore sections from surface down. Top depth is assumed as rig floor.

Bottom Depth (ft) ID (in) OD (in) Type

Enter workstring components from surface down. Multiple entries can be made for ID changes of the same size pipe / casing / liner

Bottom Depth (ft) ID (in) OD (in) Type

Directional survey — TVD is auto-calculated using Minimum Curvature.

MD (ft) Inc (°) Azi (°) TVD (ft) (calc)

Pump Output

bbl/stroke

Stroke counter (optional)


Initial Wellbore Fluids

Leave volume blank to assume a full wellbore

Name Density (ppg) Colour Volume (bbl) Location

Pump Schedule

Ensure the toggle button is correct for the flowrate input

Name Density (ppg) Colour Volume (bbl) Pump Rate (gpm)

Advertisement